Builder Advisories

On this page you will find a collection of advisories, bulletins, and notices from the factory.


Please select your model:


T-51 Mustang Section


Fuel Tank Leak Test

Prior to finish riveting the wing, the fuel tanks should be checked for leaks. Checking for leaks should be standard practice when building any aircraft, but at least one T-51 builder did not do this. Each tank, with fittings installed, can either be pressure checked with no more than 1/4 lb. of air pressure or simply filled with fuel after installation but prior to permanently closing the center section. If a leak is detected at a fitting, reseal the fitting and perform another leak test. If a leak is detected in a tank, Titan Aircraft will replace the tank.


Forward Brake Pedal Advisory
Issue Date:  March 4, 2009


Bellcrank Stiffener Advisory
Issue Date:  March 4, 2009



Tornado Section


Engine Mount Safety Notice
Issue Date:  February 26, 2010


Vertical Stabilizer Gusset Serivce Letter
Issue Date:  November 22, 2009


Hinge Safety Notice
Issue Date:  October 24, 2002


Counterweights with Spades Safety Bulletin
Issue Date:  March 7, 2002


 
©2010 Titan Aircraft Company 1419 State Rt. 45 S. Austinburg Oh. 44010 Tel: 440-275-3205
Information Sales Support