Builder Advisories
On this page you will find a collection of advisories, bulletins, and notices from the factory.
Please select your model:
T-51 Mustang Section
Fuel Tank Leak Test
| Prior to finish riveting the wing, the fuel tanks should be checked for leaks. Checking for leaks should be standard practice when building any aircraft, but at least one T-51 builder did not do this. Each tank, with fittings installed, can either be pressure checked with no more than 1/4 lb. of air pressure or simply filled with fuel after installation but prior to permanently closing the center section. If a leak is detected at a fitting, reseal the fitting and perform another leak test. If a leak is detected in a tank, Titan Aircraft will replace the tank. |
Forward Brake Pedal Advisory
Issue Date: March 4, 2009
Bellcrank Stiffener Advisory
Issue Date: March 4, 2009
Tornado Section
Engine Mount Safety Notice
Issue Date: February 26, 2010
Vertical Stabilizer Gusset Serivce Letter
Issue Date: November 22, 2009
Hinge Safety Notice
Issue Date: October 24, 2002
Counterweights with Spades Safety Bulletin
Issue Date: March 7, 2002